Availability is the headline KPI in most wind O&M contracts. But a turbine that is unavailable for an hour on a calm night and one that is down for an hour in a storm count the same in time-based terms, and cost very different amounts of energy.

Last updated: 14 October 20263 min readBy the nxtGrid team
On this page
  1. Two ways to measure availability
  2. Who is responsible for the downtime?
  3. Estimating lost production
  4. Underperformance that availability misses
  5. How nxtGrid helps

Two ways to measure availability

Time-based availabilityEnergy-based availability
QuestionFor how much of the time could the turbine operate?How much of the possible energy could the turbine produce?
FormulaAvailable time ÷ total time (with agreed exclusions)Actual energy ÷ (actual energy + lost energy)
StrengthSimple, easy to auditReflects the commercial impact of downtime
WeaknessIgnores when downtime happensNeeds an estimate of lost production

The IEC 61400-26 series defines both approaches and the categories that sit behind them. Many contracts use time-based availability for warranties and energy-based availability for performance reviews.

Who is responsible for the downtime?

Contracts usually split unavailable time into categories, because only some of it counts against the OEM or O&M provider:

  • Turbine faults and repairs (usually the OEM's responsibility)
  • Scheduled maintenance, sometimes within an allowance
  • Grid outages and curtailment instructions
  • Weather outside the design envelope: extreme wind, icing, lightning
  • Owner-requested stops

Estimating lost production

  1. Take the wind speed during the downtime from the turbine's own anemometer, or from neighbouring turbines if its sensors were down.
  2. Look up the expected output on the turbine's reference power curve, adjusted for air density.
  3. Sum the expected output over the downtime period: that is the estimated lost energy.
Worked example · illustrative numbersOne turbine, one afternoon

A 3 MW turbine is down for 4 hours while neighbouring turbines record an average 9 m/s. The reference curve gives about 1.6 MW at that speed.

Lost energy ≈ 1.6 MW × 4 h = 6.4 MWh. The same 4 hours on a calm night might have cost almost nothing.

Underperformance that availability misses

A turbine can be 100% available and still lose energy if it runs below its power curve. Comparing measured output with the reference curve by wind-speed band, after filtering for curtailment, icing and data quality, highlights pitch, yaw or sensor problems that never trigger an availability alarm.

How nxtGrid helps

How nxtGrid helps
  • Turbine-level generation, operating states, alarms and availability across farms, where the data is accessible
  • Power-curve deviation analysis by wind-speed band
  • Trends of temperatures and repeated fault patterns to support investigations
  • Inspections and repairs assigned and tracked through maintenance workflows

Wind monitoring → CMMS & field operations →

FAQ

Frequently asked questions

Which availability should we report?

Report the one your contract defines, and track energy-based availability internally as well, because it reflects the money.

Can power-curve analysis prove a fault?

No. It is an investigation signal that needs filtering and context, but it is often the first sign of a pitch or yaw problem.

Book a demo

See how nxtGrid could fit your operating model.

Tell us the size of your portfolio, the technologies you operate and the tools you use today. We will map the workflows, integrations and product modules relevant to your sites.

Next step

Or talk to an engineer now: +91 99900 62445